Hi there, register for our upcoming webinar on Designing for Differential Settlement with Geohazard Resistant Steel Pipe. Plus, see the latest trenchless technologies from Permalok®.
View in browser
Hero Masthead Fall 2023 - Email v2
Facebook
LinkedIn
X


UPCOMING WEBINAR

 

Designing for Differential Settlement:

How to Reduce Risk and Lower Costs with Geohazard Resistant Steel Pipe

IJS Teams Webinar Cover Graphic 05-2024

Technical Webinar
Tuesday, May 7, 2024  |  12:00 P.M. - 1:00 P.M. CST

 

Join us for an introduction to the InfraShield® Joint System, an innovative, fully welded Geohazard Resistant Steel Pipe (GRSP) technology designed to safeguard steel pipelines in differential settlement areas—without the need for couplings or gasketed joints. Installation requires no specialized tools, training, or supervision, resulting in reduced risk and lower installed costs.

 

Learn how the patent-pending technology works from the engineers who developed it, as they discuss the design concept, full-scale testing, and its application in a major Texas water transmission project. Then, discover how to easily specify InfraShield® for differential settlement areas using a simple design table.

 

Earn Up to 1 PDH / CEU credit for attending*

 

Register Now

*Check with your local licensing agency for eligibility. A certificate of completion will be provided after the webinar.

 


PROJECT NEWS

 

Recent Projects

8 mile project

8 Mile Pump Station 54-Inch Force Main

This sanitary sewer project for the Oakland County Water Resource Commissioner upgrades the discharge capacity of the 8 Mile Road Pump Station with a new force main consisting of 6,040 LF of 54-inch engineered steel pipe manufactured by Northwest Pipe Company.

Read More >>

Perris Valley project

Perris Valley Pipeline - Interstate 215 Crossing

The final phase of this Metropolitan Water District of Southern California water supply project includes a mile-long tunnel being constructed with Permalok® Steel Casing Pipe. Our team was on-hand to celebrate the ground-breaking in late January.

See on LinkedIn >>


TRENCHLESS TECHNOLOGY

 

Introducing the Permalok® CC Joint & Quick Bore System

permalok cc joint

We’re excited to announce the launch of two new trenchless piping solutions specifically designed to optimize efficiency in Pilot Tube Guided Auger Boring Applications:

  • Permalok® CC (Cycle Casing) Joint - A reusable steel casing tool engineered to effectively upsize pilot tube or auger bores to the final product casing size. The CC Joint connects without welding and disconnects easily in the exit pit with zero cutting, breaking, or refinishing required.
  • Permalok® Quick Bore System - A packaged solution that includes both the CC Joint cycle casing tool and the final product pipe (Permalok® AB Joint steel casing, C200 steel carrier pipe, RCP, or HDPE-Lined Perfect Pipe). This dual system leverages the precision of the pilot tube installation method, completing bores faster while upsizing to more efficiently remove spoils for larger diameter installations. 

For more information, contact Bryan Swanson - Trenchless Outside Sales Representative: bswanson@nwpipe.com


UPCOMING EVENTS

 

See You at the Show!

IJS at show

Texas Water Show

4/9-4/12 | Fort Worth, TX | Booth # 936

 

NASTT No-Dig Show 

4/15-4/17 | Providence, RI | Booth #1106

 

AZ Water Conference

4/23-4/25 | Phoenix, AZ | Booth #1114

 

PNWS AWWA Section  Conference

5/1-5/3 | Spokane, WA | Booth #5

 

Microtunneling Short Course 

5/7-5/9 | Scottsdale, AZ

 

AWWA ACE24

6/10-6/13 | Anaheim, CA | Booth #2304

 

Drop us a line.

Interested in learning more about our products? Questions about a project?

    Contact Us
    Facebook
    LinkedIn
    X

    Northwest Pipe Company, 201 NE Park Plaza Drive, Suite 100, Vancouver, Washington 98684, United States, 13603976250

    Unsubscribe Manage preferences